The Holiday Shutdown Checklist for Fab Shops

Holiday shutdown week is the one stretch of the year when your machines can be down without pushing back a customer’s job. Use it well and you start January with equipment that’s inspected, tuned and ready for the Q1 rush. Waste it, and the problems you put off all year will show up in February, right when you’re busiest.

This checklist covers what to plan before you shut down, what to inspect on your press brakes, fiber lasers and tooling, and what to check before you power back up. Print it, hand it to your maintenance lead, and work through it one machine at a time.

Tanner working on a machine that we didn’t sell at one of our customers’ facilities.

Plan Before You Shut Down

The shops that get the most out of shutdown week do the planning in November, not on the first day off. Two or three weeks out, work through these:

  • Walk the floor with your operators. Ask each one what’s been bugging them: a noise, a slow axis, a cut that’s not as clean as it used to be. They know before anyone else.
  • Pull your maintenance logs. Note what’s coming due on hours and what got skipped during busy months.
  • Order parts and consumables now. Filters, oil, nozzles, protective windows and lenses can take time to arrive in December.
  • Book outside service early. Technicians’ calendars fill fast in the last two weeks of the year.
  • Assign an owner to every machine. One person responsible for each checklist keeps tasks from falling through the cracks.
  • Plan lockout/tagout. Confirm who is authorized to work on each machine and that your LOTO procedures are current.

Press Brake Checklist

A press brake can run for years with small problems that slowly eat into accuracy. Shutdown week is the time to catch them. Always follow your manufacturer’s manual for intervals and specs.

Hydraulics

  • Check hydraulic oil level and condition. Milky, dark or burnt-smelling oil needs attention.
  • Change the oil and filters if they’re due on hours.
  • Inspect hoses, fittings and cylinder seals for leaks or wear.
  • Clean the oil cooler or heat exchanger.

Accuracy and motion

  • Check ram parallelism and repeatability against a known test bend.
  • Verify crowning is working correctly across the full bed length.
  • Inspect the backgauge: clean and lubricate rails and ball screws, and check finger positioning.
  • Look for wear or play in the ram guides (gibs).

Electrical and safety

  • Test light curtains or laser guarding, foot pedals and every E-stop.
  • Inspect cables and connectors for damage.
  • Back up the controller: programs, tool libraries and machine parameters.

Fiber Laser Checklist

Fiber lasers need less routine care than CO₂ machines, but neglecting the basics still shows up as dirty cuts, dross and unplanned downtime.

Cutting head and optics

  • Inspect and clean or replace the protective window.
  • Replace worn nozzles and ceramic rings.
  • Check focus and nozzle centering.
  • Test height-sensing calibration.

Chiller and cooling

  • Check coolant level and condition; replace it if it’s due.
  • Clean chiller filters and condenser coils.
  • Confirm the chiller holds its set temperature.

Motion, table and exhaust

  • Clean and lubricate rails, racks and gears.
  • Clean or replace slats, and empty slag and scrap bins.
  • Service the dust collector: change filters and empty the drum.
  • On shuttle-table machines, inspect the table exchange and its drive.

Gas and software

  • Check gas lines, regulators and connections for leaks.
  • Back up cutting parameters, programs and machine settings.

Tooling Checklist

Worn tooling is one of the most common causes of inconsistent bends, and it’s easy to miss when the brake is running every day.

  • Pull and clean every punch and die.
  • Inspect tips and shoulders for chips, cracks and uneven wear.
  • Check tool heights against spec. Mixed heights across a setup cause inconsistent angles.
  • Clean and inspect clamping systems and tool holders.
  • Reorganize storage and label every tool so setups are faster in January.
  • Make a replacement list now so new tooling arrives before the busy season.
During the holiday shutdown, check your tooling

Shop, Safety and Training

The week is also a chance to fix things around the machines that never get attention during production.

  • Check compressed air: drain tanks, change dryer filters and fix leaks.
  • Clean electrical cabinets and confirm cooling fans and filters are clear.
  • Inspect cranes, hoists, lifting gear and forklifts.
  • Restock PPE and first-aid supplies.
  • Plan any equipment moves or new installs so they’re running on day one.
  • Schedule operator training while the floor is quiet: cross-train on a second machine or refresh programming skills.

Before You Power Back Up

Don’t let the first job of the year be the test run. Before production restarts:

  • Warm up hydraulics and spindles per the manufacturer’s procedure.
  • Home all axes and run a test bend and a test cut.
  • Verify safety systems one more time.
  • Check that coolant, oil and gas levels hold after startup.
  • Log everything you did, so next year’s shutdown starts from a clear record.

Want Help During Your Shutdown?

We offer preventative maintenance and service for press brakes and fiber lasers, including machines we didn’t sell. If you’d rather have a technician handle your shutdown work, contact our service team with your dates. December fills up quickly, so earlier is better.

— Matt Moore, CEO and Owner, Moore Machine Tools